Project BOM Preparation and Pre-Shipment Quality Checks

Project fixture schedules and pre-shipment checks for lighting: 98 catalogued models, batch consistency, power-on function checks, per-model documentation.

Two technicians inspecting a long aluminium LED profile on a workbench in a production area
Technicians checking an assembled linear profile before packing.
Short answer

A project BOM for architectural lighting is a fixture schedule that fixes model, wattage, beam angle, colour, control mode, length, IP rating and quantity for every installation zone before pricing. Guangdi Xingcan prepares BOMs from elevation drawings across 98 catalogued fixture models and 53 co-extruded profiles, groups fixtures by production batch for colour consistency, and powers every unit for a function check before packing.

When this applies

This capability covers the documentation and checks we perform around an order. It does not cover third-party inspection, on-site acceptance testing, installation supervision, or a published quality-management certification.

Technical specifications

Catalogue basis98 fixture models + 53 co-extruded flexible entries
BOM fieldsModel, wattage, beam angle, colour, control, length, IP rating, quantity, zone
Catalogue split10 linear / 20 wall washer / 29 floodlight / 12 in-ground / 27 pixel models
Batch controlFixtures for one visible elevation grouped by production batch
Pre-shipment checkPower-on, function, address response, connector and bracket check
DocumentationCE documentation available per model; scope confirmed per project
Report requestsRoHS and IP test reports can be requested per model
ExcludedNo published ISO 9001 / IATF certification, no fixed MOQ or lead time

Where it is the right choice

  • Contractors tendering a facade project who need a priced fixture schedule
  • Multi-zone projects mixing wall washers, linear lights and pixel nodes
  • Buyers who need colour consistency across one visible elevation
  • Projects that require per-model documentation before shipment

Where it is the wrong choice

Stating this explicitly matters more than a capability list: if your project falls into one of these categories, a different fixture family or a separate specialist review is the right answer.

  • Requests for a fixed MOQ, fixed lead time or blanket warranty in the BOM
  • Assuming a single certificate covers all 98 catalogued models
  • Third-party inspection, on-site acceptance testing or installation supervision
  • Projects where client drawings must be published or shared externally

Documents and tools used

  • BOM template with per-line control, IP and zone fields
  • 2026 catalogue model index and dimension tables
  • Batch grouping and colour consistency checklist
  • Pre-shipment power-on and function check record
  • Per-model CE / RoHS / IP documentation request list
Project BOM & Quality Checks

Project questions

What exactly is in your project BOM?

Each line records model, wattage, beam angle, colour, control mode, length, IP rating, quantity and installation zone, plus the required accessories. That is what makes the quotation comparable between contractors and prevents a DC24V line being mixed with an AC220V line.

Do you provide a fixed MOQ and lead time?

No. MOQ and lead time are confirmed per product and project in the quotation. We do not publish fixed numbers because the fixture mix, control configuration and batch grouping change the schedule.

Can I get one CE certificate covering the whole order?

CE documentation is available per model, and the scope is confirmed per project. Because a project commonly mixes wall washers, linear lights, floodlights and pixel nodes, the documentation is assembled per model line rather than as one blanket certificate.

Send your facade drawings or lighting effect renders

Share an elevation drawing, an effect render or a draft fixture list. Our project engineers return a fixture BOM, beam-angle and optical distribution suggestions, and DMX512 addressing coordination. Final selection, quotation and installation are confirmed with your technical team.

Chat on WhatsApp